Thursday 31 March 2016

March 2016/Construction changes and starting with the interior

Construction changes and starting with the interior



During Easter holidays we stayed again in Vorarlberg for 1 week. Our aim was to produce the galley structure, to do the most important changes according Iains advices and again some paint jobs. As we had already checked out the dimensions of sink, oven and fridge we intended to buy the first part wasn't too difficult to get ready. In the meantime Eva painted the foreship for two times with Epifanes two pack PU.
 
On the left pic you can see the principal form of our galley. To get it ready, I had to make templates first. 
 
our foreship in bright white





 

Left side you can see the construction changes I made to get rid of the compressionpost.

Nevertheless I decided to produce one just in case..... 



Also this week I produced the base for a small cabinet and the battery box for the engine (the rectangular box beside the centerboard case)





Finally the berth construction took shape